busbar machine manualbusbar bending machine manufacturer in pune
Workshop production technical requirements
1. When the components are fixed, it is required to be vertical and flush.
2. When installing the surge protector, it is required to be close to the ground row. If it is a floor cabinet, it is required to sink to within 200 to 500 mm from the bottom of the cabinet.
3. When all component mounting beams are connected to the plastic sprayed parts, grab pads and anti-loosening measures are required. The grab pads are placed on the side of the sprayed beam.
4. The number tube number must be correct. The reading recognition sequence is: horizontal direction from left to right, and vertical direction from bottom to top sheet metal bending.
5. The position relationship between the indicator light and the button of the main entrance cabinet of the standard power distribution room is:
Green light red light
Opening instruction Closed instruction
Red button green button
Open button Close button
6. When the cabinet door and cabinet door have secondary components or special requirements, all doors are grounded (the nearest grounding method is used when there are no special requirements in the field), and the structural design is required to be on the cabinet cabinet corresponding to the grounding nail on the instrument door. Design the location of welding ground nails.
7. All floor cabinets should maintain high consistency when installing the terminal block and other small auxiliary components in the vertical direction, and start to clamp the component terminal block based on the ground at a height of 1.2 meters (except for special cases).